Name :
Thomas Kilian
Organisation :
TMMW Services (Pty) Ltd
Country :
South Africa
CAMA Certificant Since :
2016
CAMA Expiry Date :
2025
Member of :
The Southern African Asset Management Association
Qualification Name :
Certified Asset Management Assessor
2016
Other Related Achievements :
AM Council Certification - CSAM
Graduate Diploma in AM, Graduate Certificate in AM, Certificate in Facilities Management Programme, Certificate IV in training & assessment
Industry Experience
Industry Sector | Key Asset Classes |
---|---|
Agriculture, Forestry, Fishing and Hunting | 3yrs-Civil and agricultural engineering assets by working with irrigation, earthen dams, pipelines, sub-soil drainage, mechanical and electrical infrastructure, erosion protection (canals, watercourses, contours, drop inlet structure, gabions), earthworks, road infrastructure (culvert, drifts), small concrete works and all of the yellow plant necessary |
Construction | 3yrs-Feasibility studies, master planning as well as detailed design and tender with its associated construction supervision on irrigation, earthen dams, pipelines, valves, PRV's, pump stations, sub-soil drainage infrastructure, mechanical and electrical infrastructure, erosion protection, water and sewage, buildings, roads, small concrete works and on yellow plant necessary to construct and maintain these. |
Educational Services | 3yrs-Feasibility studies, master planning as well as detailed design and tender with its associated construction supervision on irrigation, earthen dams, pipelines, valves, PRV's, pump stations, sub-soil drainage infrastructure, mechanical and electrical infrastructure, erosion protection, water and sewage, buildings, roads, small concrete works and on yellow plant necessary to construct and maintain these. |
Health Care and Social Assistance | 1yrs-Scoped and planned the condition assessment work to document maintenance work requirements on seven (7) hospitals as part of the Gauteng Hospital Revitalisation Programme. Lead the professional team that scoped, planned and undertook condition assessment work to document maintenance work requirements on more than 100 health (clinics and care centres) and 25 social development (hostels and social housing rental stock) facilities. |
Information | 2yrs-Information management system used to scope, plan and implement infrastructure reconstruction on more than R5 billion of public infrastructure damaged by floods. |
Management of Companies and Enterprises | 3yrs-As part of top management in the built environment, sourced the work from the market place where after each project was resourced with professional team members and other resources - this was then followed by the basics of management (plan, organise and control) in order to manage each project to completion by focussing on the |
Mining, Quarrying and Oil/Gas Extractions | 1yrs-Energy saving and energy efficiency technology from OEM, with electrical infrastructure and petroleum infrastructure used for yellow plant during underground or open-pit mining. |
Professional, Scientific and Technical Services | 3yrs-Professional consultancy services on civil / agricultural engineering to clients in the private sector, municipalities, provincial and national departments as well as utilities / entities of government (SANEDI, water boards and water trading entity) when planning for infrastructure, implementing infrastructure, maintaining infrastructure and ultimately disposing of infrastructure. Conduct practices assessment and developed practices improvement plans. |
Public Administration | 3yrs-Buildings, communication equipment, parks & recreation, pipelines, pumping & distribution, refrigeration equipment, reservoirs, roads, storm water, sumps, transportation assets, treatment plants, valves, waste management / recycling facilities, water and sewerage pipelines, water and waste water infrastructure. Developed maintenance strategies and preventative maintenance management plans for water and waste water, solid waste and roads and storm water. Conduct practices assessment and developed practices improvement plans. |
Transporting and Warehousing | 1yrs-Public transport infrastructure (such as taxi ranks, bus terminals) and integrated public transport infrastructure (such as integrated rapid transport plans, non-motorised transport (NMT) and bus rapid transport (BRT)) systems. |
Utilities | 1yrs-Water supply and waste water used to serve customers within the Utility's service delivery area - these utilities are serving mostly public sector consumers dependent on a basic services. Work on their office precincts, buildings, houses at dams and workshops / store rooms. Developed maintenance strategies and preventative maintenance management plans for water and waste water, solid waste and roads and storm water. |